Poproś o wycenę

Segmentowe magnesy neodymowe na zamówienie

Build tighter motor air gaps with sintered NdFeB arc segment magnets ground to ±0.05 mm and rated up to 200°C. Order from 1 prototype set with ~25-day custom production.

  • Paired ID-N / ID-S Poles: Parallel or radial arc magnetization matched for balanced multi-pole rotor rings.
  • High-Temp SH to EH Grades: Hold intrinsic coercivity up to 150°C–200°C in thin-wall, high-load motors.
  • Low-Friction Prototyping: Start from 1 piece or 1 rotor set before committing to volume tooling.
Zakres wymiarów
0.2–300 mm custom OR/IR, arc angle, thickness, length
Tolerancja wymiarów gotowego wyrobu
±0.10 mm standard; ±0.05 mm precision (±0.02 mm mating)
Motor Grades
N35–N56; M (100°C) to EH (200°C) / AH
Magnesowanie
Parallel-arc (ID-N / ID-S) or radial per drawing
Minimalna ilość zamówienia (MOQ)
1 piece or 1 rotor set (no strict MOQ)
Termin realizacji
~25 days custom (~7–15 days simple samples)
Quality & Warranty
IQC/IPQC/OQC verified; warranty terms per quotation
Czynniki wpływające na cenę
Grade (SH–EH), tolerance, wire-cut vs. grinding, lamination
Segmentowe magnesy neodymowe na zamówienie

Are Neodymium Segment Magnets Right for Your Rotor?

Choose arc segments for multi-pole surface rotors; switch to rings or blocks when geometry changes.

Twój cel Kluczowy wybór Standardowe zastosowanie Kiedy wybrać wyższy wariant lub zmienić rozwiązanie Kontrola przed zamówieniem
Build a tight multi-pole rotor Arc segments, ring, or blocks? Use concentric arc segments for medium-to-large multi-pole SPM rotors. Switch to a ring for small shafts, or blocks for IPM slots. Verify pole count × arc angle leaves 2°–5° gaps.
Cut magnetizing tooling cost Parallel-arc or true radial? Use paired parallel-arc segments (ID-N/ID-S) for 12+ poles (≤45° arcs). Split wide 60°–90° poles or quote true radial for low cogging. Check edge flux vector angle (θ/2) in FEA.
Prevent hot-rotor demagnetization N, SH, UH, or EH grade? Use N35–N52 below 80°C, or N42SH up to 150°C thick walls. Upgrade to N38UH (180°C) or N38EH for thin walls or field weakening. Check worst-case temperature and Hcj margin at min thickness.
Control PWM heat or cogging Solid, laminated, or skewed arcs? Use solid sintered arcs for low-to-medium speed, low-ripple motors. Switch to laminated arcs for 5–20 kHz PWM, or skewed arcs for cogging. Share max RPM, PWM frequency, and measured rotor temperature.

Need a full 360° ring, rectangular IPM blocks, or a Halbach array? Compare Pierścieniowe magnesy neodymowe, Blokowe magnesy neodymowe, or our Halbach Arrays Guide.

Technical Specifications and Drawing Standards

OSENC grinds sintered NdFeB arcs up to 300 mm with ±0.05 mm precision available.

Parametr Standard OSENC Capability High-Spec / Engineering Benchmark
Geometry & Tolerances
Size & Shapes0.2–300 mm small and large arcsConcentric, skewed, notched, or grooved per drawing
Five Drawing InputsOR, IR, thickness (T), length (L), arc angle (θ)Specify arc angle OR chord width (avoid over-constraining)
Tolerancja wymiarów gotowego wyrobu±0.10 mm standard coated±0.05 mm precision; ±0.02–0.05 mm fine-ground faces
Edge ChamferR0.3–R0.5 mm protective chamferPrevents chipping and carbon-fiber sleeve abrasion
Grades & Thermal Limits
Gatunki standardoweN35–N56 (≤80°C at L/D ≥ 0.7; N56 ≤70°C)Low-heat couplings and intermittent actuators
High-Temp SuffixesM (100°C), H (120°C), SH (150°C)UH (180°C), EH (200°C), AH (220–230°C)
IEC 60404-8-1 ReferenceN42SH: Br 1.28–1.32 T, Hcj ≥ 1,592 kA/mN38UH: Hcj ≥ 1,990 kA/m; N38EH: Hcj ≥ 2,388 kA/m
Thermal Coefficientsα(Br) ≈ -0.10 to -0.12%/°Cβ(Hcj) ≈ -0.47 to -0.55%/°C; verify hot-spot margin
Magnetization & Coatings
Magnetization & PolarityPaired parallel-arc (ID-N / ID-S)True radial or multi-pole per drawing; laser/ink marks
Eddy-Current OptionsSolid sintered concentric arcsLaminated slices (0.5–2.0 mm, <20–40 µm bond) or skewed
Coatings & Salt SprayNi-Cu-Ni (15–21 µm), Zinc (8–15 µm), Epoxy (15–40 µm)Parylene, Everlube, PTFE; Epoxy 408h salt spray: 0.907% loss
Bonding & High RPMGlue gap 0.05–0.15 mm (count inside air gap)Add carbon-fiber or stainless sleeve above ~10,000 RPM

Drawing Inputs and Tolerance Stack-Up

Coating adds to both faces, so always specify finished after-coating tolerances on your drawing.

  • Account for Plating Stack-Up: Finished size equals bare magnet plus twice the coating thickness (30–80 µm for Epoxy).
  • Avoid Over-Constraining: Dimension OR, IR, thickness, length, and either arc angle or chord width—never both.
  • Lock Six RFQ Fields: Mark grade, peak heat, magnetization, ID-N/ID-S mark face, coating, and flux limits.

See our Magnesy z powłoką epoksydową data for full salt-spray results.

Drawing Inputs and Tolerance Stack-Up

Rotor Cost Drivers and a 12-Pole Sizing Example

Matching magnetization, grade, and machining to pole count cuts motor magnet cost without losing torque.

12-Pole Servo Rotor Example (135°C)

A 12-pole rotor with 26° arcs runs cleanly on paired parallel-arc segments without radial pressing dies.

  • Inputs: 12 poles, OD 64 mm, ID 56 mm (4 mm wall), 26° arc, 25 mm length, 135°C.
  • Ring Fit: Twelve 26° arcs span 312° (0.867 pole-arc, 4° gaps). Edge flux tilts 13° (cos 13° ≈ 0.974).
  • Grade Margin: Check N42SH (150°C) at minimum permeance (Pc). Step up to N38UH (180°C) under heavy field weakening.
  • Change A (4 Poles, 82°): Edge tilt hits 41° (cos 41° ≈ 0.755). Split poles or quote radial.
  • Change B (20 kHz PWM, 155°C): Switch to laminated N38UH or N38EH segments with a retaining sleeve.
Rotor Cost Drivers and a 12-Pole Sizing Example

Four Ways to Cut Unit Cost

Smart tolerance zoning and process staging lower landed cost more than downgrading magnet grade.

  • Stage Machining: Prototype via single-wire cutting; shift to multi-wire or profile grinding for volume.
  • Avoid Over-Spec Grade: Stepping up one thermal class (SH to UH) adds ~10%–15% material cost.
  • Zone Tolerances: Hold ±0.05 mm on mating OR/IR faces; keep non-mating lengths at ±0.10 mm.
  • Ship Unmagnetized: Magnetize rotors at your plant to skip air-freight magnetic shielding fees.

Compare topologies in our Motor and Permanent Magnet Guide.

Send your specs so OSENC engineer Ben and our team can confirm tolerances and machining routes. Enter specs in our form, then email or WhatsApp your STEP/PDF drawings.

Rotor Assembly, Troubleshooting, and Incoming QC

Slide segments sideways with non-magnetic jigs and inspect total flux with a Helmholtz coil.

3-Step Line Assembly Checklist

Controlled sliding, IPA degreasing, and polarity checks prevent most prototype chipping and reversed-pole rework.

  • 1. Slide Sideways: Wear pinch protection and use spacers—sintered NdFeB (≥550 Hv) shatters on impact.
  • 2. Degrease & Check Poles: Clean hubs with IPA and confirm ID-N/ID-S marks before gluing.
  • 3. Cure & Add Spares: Order +2 spare arcs per prototype and cure adhesive before sleeving.

First-Step Troubleshooting for 3 Field Failures

Check thermal demagnetization, bond lines, and plating scratches before adjusting motor firmware.

  • Permanent Torque Drop: Measure cold back-EMF vs. baseline to confirm low-Pc thermal demagnetization.
  • Chipping or Debonding: Check chamfer radius (R0.3–R0.5 mm), glue gaps, and smooth Nickel prep.
  • Humid or Oil Rust: Check assembly scratches; switch from Nickel to Epoxy or Parylene.
3-Step Line Assembly Checklist

Incoming QC & Helmholtz Flux Verification

Curved surfaces skew handheld Gaussmeter probes, so use Helmholtz coils for repeatable acceptance.

  • Helmholtz Flux Sorting: Keep magnet length under 1/3 coil diameter to sort total dipole moment.
  • Geometry & Curves: Match batch B-H curves with CMM checks on coated OR, IR, and thickness.
  • OSENC Dongguan Factory: Founded in 2019, OSENC runs IQC/IPQC/OQC with CMM, optical gauges, and teslameters.

Optional 100% screening and Class 100–10,000 cleanroom packing are available per order. See our Quality Management System.

Incoming QC & Helmholtz Flux Verification

Sampling, MOQ, Lead Time, and Export Shipping

MOQ starts at 1 piece. Custom arc production averages ~25 days with IATA-compliant shielded packing.

Termin OSENC Standardowe możliwości Order Confirmation Note
Prototyping & MOQNo strict MOQ; from 1 piece or setSingle-wire cutting speeds samples; +2 spares advised
Czas realizacji próbek~7–15 days (simple wire-cut arcs)Precision grinding, skewing, or lamination per drawing
Mass Production~25 days reference (20–30 days typical)Varies with SH–EH stock, coating, and volume
Tooling & NREParallel-arc avoids radial pressing diesRadial dies, skew fixtures, and coils quoted upfront
ComplianceISO 9001; RoHS & REACH on requestCertificates, B-H curves, and CMM reports per order
Transport lotniczyIATA PI 953 (UN 2807) shielded packing<0.002 G at 2.1 m or ship unmagnetized

Projects follow five steps: drawing review, engineering feedback, quote, sample validation, and OQC production. See our Custom Neodymium Magnets Process.

Sampling, MOQ, Lead Time, and Export Shipping

Najczęściej zadawane pytania dotyczące neodymowych magnesów segmentowych

Direct engineering answers on arc tolerances, magnetization, thermal grades, lamination, and flux testing.

What dimensions must I put on a neodymium arc segment magnet drawing?

Include five core dimensions, edge chamfers, and after-coating tolerances on every arc drawing.

  • Specify outer radius (OR), inner radius (IR), radial thickness, and axial length.
  • Call out arc angle or chord width—not both—to prevent over-constraining.
  • Add R0.3–R0.5 mm chamfers and ±0.05 mm or ±0.10 mm coated tolerances.
Should I choose parallel-arc or true radial magnetization for my motor rotor?

Use paired parallel-arc segments for 12+ poles (≤45° arcs) to skip radial pressing tooling.

  • At 26° arc angle, edge flux tilts only 13° (cos 13° ≈ 0.974).
  • Order matched ID-N and ID-S pairs with laser or ink polarity marks.
  • Quote split sub-segments or true radial only on wide 60°–90° poles.
Can N42SH (150°C) safely run in a 135°C continuous motor rotor?

Only if wall thickness provides sufficient permeance (Pc) and demagnetizing current stays moderate.

  • Thick segments (≥6 mm) without heavy field weakening often work with N42SH (Hcj ≥ 1,592 kA/m).
  • Thin 4 mm walls or PWM eddy heating require N38UH (180°C) or N38EH (200°C).
  • Verify hot-spot Hcj margin using β(Hcj) ≈ -0.47 to -0.55%/°C.
When are laminated neodymium arc magnets worth the extra cost?

Switch to laminated arcs when 5–20 kHz PWM harmonics overheat solid magnets toward demagnetization.

  • Eddy losses scale with thickness squared; 0.5–2.0 mm insulated slices cut losses ~60%–90%.
  • Low-to-medium speed motors run more economically on solid sintered arcs.
  • If cogging torque—not rotor heat—is the issue, choose skewed arcs instead.
Why do handheld Gaussmeter readings vary on curved arc magnets?

Probe tilt or a 0.5 mm shift on curved arcs causes large point-reading errors.

  • Measure total flux using a Helmholtz coil (magnet length < 1/3 coil diameter).
  • Pair flux sorting with batch B-H demagnetization curves to verify grade.
  • Check coated OR, IR, and radial thickness with CMM or optical gauges.

Pierścieniowe magnesy neodymowe

Full 360° solid rings for compact shafts and axial-hole assemblies.

Blokowe magnesy neodymowe

Rectangular NdFeB blocks for interior permanent magnet (IPM) rotor slots.

Magnesy z powłoką epoksydową

Salt-spray tested coatings for humid motors and adhesive rotor bonding.

Motor and Permanent Magnet Guide

System comparison of PMSM, BLDC, thermal risk, and Układy Halbacha.

Request Your Custom Segment Magnet Quote

Share your rotor geometry, grade, temperature, and quantity to get an engineering quote.

  • Geometry: OR, IR, arc angle (or chord), thickness, and axial length.
  • Gatunek i temperatura: Target grade (N35–N56 or M–EH), continuous and peak heat.
  • Magnesowanie: Parallel-arc or radial, pole count, and ID-N/ID-S mark face.
  • Coating & Tolerance: Ni-Cu-Ni, Epoxy, or Parylene, plus finished tolerance class.
  • Wielkość zamówienia i kontrola jakości: Prototype sets, production forecast, and flux/CMM report needs.

Our contact form accepts specs without file uploads. Submit parameters below, then send STEP, CAD, or PDF drawings via reply email or WhatsApp (+86 139 2737 7121).

Uzyskaj aktualne ceny i specyfikacje na ten miesiąc

Uzyskaj szybką wycenę (cena + termin realizacji)

Podaj szczegóły projektu, aby omówić cenę, specyfikację, wielkość zamówienia i opcje wysyłki.